Solar losses and shading: combine assumptions without counting them twice
Work through total derate, sequential percentage losses and the limits of a simple production model.
By Kyle Bell · Original examples and linked primary references · November 17, 2026
A simplified solar estimate needs a way to move from idealized nameplate output to an estimate that reflects real operating conditions. A total derate is one practical way to do that, provided its meaning is clear. It should represent the combined reduction the user intends to apply, rather than a number borrowed from another model without understanding what that model calculates separately.
In this calculator, a 20% total derate retains 80% of the idealized energy. For a 6 kW array and an assumed 4.5 peak sun hours per day, the initial product is 27 kWh/day. Applying the derate gives 27 × 0.80 = 21.6 kWh/day. The 20% figure is an illustrative planning assumption, not a measured loss for a specific roof.
Percentage points are not percentage changes
If the total loss assumption rises from 20% to 30%, estimated output falls to 27 × 0.70 = 18.9 kWh/day. The loss input increased by ten percentage points. The resulting energy fell by 2.7 ÷ 21.6 = 12.5%. Describing the energy change as simply “10% less” would be inaccurate.
This distinction becomes useful when comparing two sets of assumptions. Record both the input change and the resulting kWh difference. A slider can show the sensitivity, but its range should not be presented as a measured probability distribution.
Separate losses multiply when applied sequentially
Suppose a teaching example uses 10% thermal loss, 4% inverter loss, 2% wiring loss and 10% shading loss. If these are separate sequential reductions, the retained fraction is 0.90 × 0.96 × 0.98 × 0.90 = 0.762048. That corresponds to a combined loss of 23.7952%, not the arithmetic sum of 26%.
Starting with 27 kWh/day, the steps produce 24.3, then 23.328, then 22.86144, and finally 20.575296 kWh/day. Over 365 identical days, the last value gives about 7,510.0 kWh. The calculation is transparent, but the four percentages still need justification before this becomes a property-specific estimate.
Keep another model's definitions intact
PVWatts' system-loss documentation treats inverter conversion and temperature effects separately from its system-loss percentage. Its approximately 14% default therefore must not be copied into a one-factor model and described as an equivalent complete PVWatts calculation. This calculator uses a simpler combined assumption and labels it accordingly.
The same caution applies to shading. If the solar-resource input already includes a reduction for the same tree or obstruction, adding that reduction again in total losses can understate output. If the source is unshaded resource, a shading allowance may still be needed. Write down which parts of the system each input represents before adjusting several percentages.
Understand what a loss slider cannot solve
Shadows vary with time and season. An annual percentage does not reproduce the effect of an individual obstruction on a particular electrical layout. Likewise, an annual average cannot determine how often an inverter reaches its output limit. Those questions need more detailed system information and time-resolved modeling.
Use the simple model to compare disclosed scenarios and identify which assumptions deserve investigation. Save the total-loss input with the result, avoid applying both a combined factor and the same component factors, and seek a site assessment before treating an estimate as a basis for equipment design or a production guarantee.
Keep learning
Solar production is not the same as electricity-bill savings